Close Menu
The Guide News
  • HOME
  • BUSINESS
  • COLUMNS
  • EDITORIAL
  • ENTERTAINMENT
  • HEALTH
  • NEWS
  • POLITICS
  • SPORTS
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
The Guide News
Subscribe
  • HOME
  • BUSINESS
  • COLUMNS
  • EDITORIAL
  • ENTERTAINMENT
  • HEALTH
  • NEWS
  • POLITICS
  • SPORTS
The Guide News
Home » FG to flag off Cross River section of coastal highway in April
latest news

FG to flag off Cross River section of coastal highway in April

AdminBy Admin7 April 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government is set to flag off construction of the Cross River Section of the Lagos-Calabar Coastal Highway on April 14.

The section is known as Section B3 of the coastal highway project.

The Minister of Works, Sen. Dave Umahi, made the disclosure at a stakeholders engagement on Section Two of the Lagos-Calabar Coastal Highway project in Lagos on Sunday.

“We are going there, to Cross River, on 14, to flag off the construction. By 15, we also go to Akwa Ibom to flag off.

“That 65km is the worst terrain. It is 65km times two, which is 130km,” he said.

On the second legacy project, Sokoto-Badagry Highway, the minister noted that one section in Sokoto was 120km.

“The third section of Sokoto-Badagry is going to start from Badagry but we have a few challenges.

“We have rivers of three kilometres to cross. That is a lot of money.

“We have proposed four options, which I am going to be discussing with Mr President, and whichever option he chooses, that is what we are going to choose.”

Umahi gave the assurance that procurement regarding the project would start as soon as the discussions would be over, after which work would start.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Admin
  • Website

Related Posts

GROUP URGES GOV ENO, ANTI-GRAFT AGENCY TO INVESTIGATE FAILED $1.5M PIONEER PRINTING PRESS

10 September 2025

RESIGNATION: NEWSPAPER CHALLENGES ROSE ESHIETT TO REFUTE REPORT WITH OFFICIAL LETTERHEAD, PAYSLIPS, EVIDENCE OF WORK SINCE APPOINTMENT

4 September 2025

GOV ENO HUMILIATES MEDIA AIDES, OTHERS OVER SAHARA REPORTERS’ STORY

3 September 2025

Comments are closed.

Facebook X (Twitter) Instagram
  • PRIVACY POLICY
  • ADVERT RATES
  • CONTACT US
  • LOGIN
© 2025 The Guide News.

Type above and press Enter to search. Press Esc to cancel.